Global Gold Mining Limited GGM.AX
AI-generated report · not investment advice · figures extracted automatically; please verify against the linked original more
Business Model#
What the company does and how it earns its money; written AI-editorially, exclusively from the company's original reports, without any assessment of our own.
Global Gold Mining Limited is a mineral exploration and development company focused primarily on the Sturec Gold Project located in Slovakia, for which it holds a Mining Activity Permit valid through 31 December 2034. The company is at a pre-revenue stage, advancing the project through technical studies and metallurgical test work toward a potential development and production decision. The company generates no revenue from operations and funds its activities through equity capital raises and shareholder loans. Cash outlays are directed toward exploration, feasibility study work, and corporate administration. The Updated Scoping Study, indicating a pre-tax NPV8% of US$768 million and an IRR of 162% over a 9-year mine life producing 1.139Moz AuEq, forms the current technical basis for project valuation, with the planned Pre-Feasibility Study representing the next formal development milestone.
Current Status#
Summary of the most recent reporting period: core figures, drivers and management statements; written editorially from the current original report, every figure backed by a source number.
Price & Chart#
Interactive price chart (TradingView) and the trend of key figures from the core tables. The price chart loads only after a click; at that point a connection to TradingView is established.
Daily candles with news and earnings markers. Loads only on click.
Share-Price Drivers#
Factors the company itself names as material for its business development (IR-based); reproduced neutrally, no price forecast and no assessment of our own.
Mining activities commenced at Sturec in December 2024 and a Pre-Feasibility Study is targeted for completion in Q4 2025, making project de-risking the central value inflection for a pre-revenue developer 8 9
Mining One appointed PFS Study Manager (Dec 2024) and PFS completion is planned for Q4 2025, with an updated scoping study issued Dec 2024 8 9
Capital raising of $9,358,250 (Jan 2026) plus a $2 million debt conversion with Minerva (Feb 2026) and prior strategic placement tranches support ongoing study and test work 5 9
A metallurgical test work program was initiated in 2025-H2 to underpin the PFS process design 9
Mining activities commenced at Sturec Gold Mine on 1 December 2024 following underground mining license extension 8 4
The Sauvolles Lithium Project acquisition agreement was cancelled/divested, narrowing the focus toward the core gold asset 8
Sector trend: As a pre-revenue gold developer, the company reports no operating revenue segments or issued guidance, so KPIs center on project milestones rather than margin or utilisation; disclosed activity points to rising development spend on studies and test work funded by recent capital raisings 9.
Event Timeline#
This timeline collects the material events from the original reports: guidance changes, revenue and margin signals, strategy shifts, product and M&A announcements. Events are grouped by quarter (most recent first); the grey tag before each event names the event type, the date is the publication date of the source. Management quotes open the quarter block as direct quotes. Per quarter we show the three most defining events; more can be expanded per quarter, older years are collapsed. Every event carries its source as a superscript, clickable number.
2026 · 2 events
2026-Q1 · Jul – Sep 2025
Net loss widened to A$2,512,183 from A$2,263,451 in the prior year; no operating revenue recognised (5)
Scoping Study revised to underground-only operation with pre-tax NPV8% of US$768 million and IRR of 162%; Mining One Pty Ltd appointed PFS Study Manager (5)
2025 · 5 events
2025-H2 · Jan – Jun 2025
Capital raising of $9,358,250 at $0.205 per share completed post-period, with additional $2 million debt conversion to Minerva Investment Company (9).
Updated Scoping Study at Sturec Gold Project delivered pre-tax NPV8% of US$768 million, IRR of 162%, and a 9-year mine life producing 1.139Moz AuEq (9).
Trevor Benson appointed Executive Chairman, Zilong Dai as Executive Director, and Michael McKeown and Stuart Hutchin as technical directors; former directors Gino D'Anna and Clifford Fitzhenry resigned (9).
2024 · 3 events
2024-H2 · Jan – Jun 2024
Half-year loss after tax of $1,261,950 from continuing operations; net cash outflow from operating activities of $581,427 (8)
Cash fell from $628,398 at 30 June 2024 to $39,021 at 31 December 2024 with $1 million facility drawn; material uncertainty regarding going concern status disclosed (8)
Mining activities commenced 1 December 2024 from main Andrej Adit; small-scale operations initiated to de-risk project and preserve Mining Licence validity (8)
2023 · 7 events
2023-H2 · Jan – Jun 2023
Half-year net loss AUD 1,309,957 vs AUD 1,689,984 in prior corresponding period (7)
Redeemable notes of AUD 1,550,000 raised at 17-20% interest; cash declined from AUD 816,540 to AUD 603,181 at 31 December 2023 (7)
Sturec Gold Mine classified as held for sale; strategic advisor appointed to coordinate potential transaction; non-binding offer received from Trans Metal Fund LLP (7)
2023-Q4 · Apr – Jun 2023
Minmetals Securities Co. appointed as strategic advisor to coordinate potential transaction discussions for 100%-owned Sturec Gold Mine (1)
Field exploration commenced at Sauvolles Lithium Project with 11 high-priority targets identified via hyperspectral remote sensing survey (1)
2023-Q3 · Jan – Mar 2023
Agreement signed to acquire 100% interest in Sauvolles Lithium Project (~300 km²) in James Bay Lithium District, Quebec, Canada (2)
Sturec JORC Mineral Resource Estimate updated to 68.347 Mt @ 1.22 g/t Au and 10.11 g/t Ag, containing 2.686 Moz gold and 22.210 Moz silver (2)
Key Figures (A$m)#
The company's core financial figures in three views, one below the other: fiscal years (as reported; after restatements the table shows the most recent filing version, marked), half-years (6-month basis, H2 = second half on its own) and quarters (3-month basis, not cumulative). Each row is one period, most recent first. Values with a dotted underline are clickable and show the raw value, the exact source location, the scale evidence and the source; derived values additionally show their formula and inputs. All values are extracted automatically from the filings; errors are possible; please verify decision-relevant figures yourself by clicking through to the linked original.
All figures serve only to support your own investment decision and are not a recommendation; the company's original reports are authoritative.
Fiscal years
| Period | Calendar quarter | Revenue | Net income | EPS (A$) | OCF | Source |
|---|---|---|---|---|---|---|
| FY2023 | Q3/2022–Q2/2023 | 0 | -6,483.5~ | -3.74 | -2.4 | 4 |
Half-years
| Period | Calendar quarter | Published | Net income | EPS (A$) | FCF | Cash | Source |
|---|---|---|---|---|---|---|---|
| 2025-H2* | Q1–Q2/2025 | 2025-09-26 | -0.4 | – | – | 1.6 | 5 |
| 2025-H1 | Q3–Q4/2024 | 2025-03-14 | -1.3 | -0.64 | – | 0 | 8 |
| 2024-H2* | Q1–Q2/2024 | 2025-09-26 | – | -1.20 | -0.8 | 0.6 | 5 |
| 2024-H1* | Q3–Q4/2023 | 2024-03-15 | – | -0.68 | -2.1 | 0.6 | 7 |
| 2023-H2* | Q1–Q2/2023 | 2024-09-30 | – | -3.74 | – | 0.8 | 104 |
Balance Sheet & Cash Flow (A$m)#
Point-in-time balance sheet items (e.g. cash, financial debt) and cash flow items (operating cash flow, investments/capex) per fiscal year, half-year and quarter. Balance sheet values are as of the period end, flow items cover the period. Derived values are marked and are calculated, for example, as: net debt = financial debt − cash; free cash flow = operating cash flow − capex; the click popover shows formula and inputs. All values are extracted automatically from the filings; errors are possible; please verify decision-relevant figures yourself by clicking through to the linked original.
Fiscal years
| Period | Calendar quarter | Published | Cash | Debt | OCF | Capex | FCF | Source |
|---|---|---|---|---|---|---|---|---|
| FY2025 | Q3/2024–Q2/2025 | 2025-09-26 | 1.6 | – | – | – | – | 105 |
| FY2024 | Q3/2023–Q2/2024 | 2025-09-26 | 0.6 | 1.3 | -1.8 | 1 | -2.8 | 5 |
| FY2023 | Q3/2022–Q2/2023 | 2024-09-30 | 0.8 | 0 | -2.4 | 2.1 | -4.5 | 4 |
| FY2022 | Q3/2021–Q2/2022 | 2023-09-21 | 2.2 | – | – | – | – | 103 |
Half-years
| Period | Calendar quarter | Published | Cash | Debt | OCF | Capex | FCF | Source |
|---|---|---|---|---|---|---|---|---|
| 2026-H1 | Q3–Q4/2025 | 2026-03-12 | 0 | – | -0.5 | – | – | 109 |
| 2025-H2 | Q1–Q2/2025 | 2025-09-26 | 1.6 | – | – | – | – | 5 |
| 2025-H1 | Q3–Q4/2024 | 2025-03-14 | 0 | 2.2 | -0.6 | – | – | 8 |
| 2024-H2 | Q1–Q2/2024 | 2025-09-26 | 0.6 | 1.3 | -0.7 | 0 | -0.8 | 5 |
| 2024-H1 | Q3–Q4/2023 | 2024-03-15 | 0.6 | 1.6 | -1 | 1 | -2.1 | 7 |
| 2023-H2 | Q1–Q2/2023 | 2024-09-30 | 0.8 | 0 | -1.1 | – | – | 104 |
| 2023-H1 | Q3–Q4/2022 | 2023-03-16 | 3.1 | – | -1.3 | – | – | 6 |
| 2022-H2 | Q1–Q2/2022 | 2023-09-21 | 2.2 | – | – | – | – | 103 |
| 2022-H1 | Q3–Q4/2021 | 2023-03-16 | 4.1 | – | 3.6 | – | – | 106 |
Products & M&A (4/8 active+recent)#
Product announcements from the reports; market launches, approvals, partnerships; with first mention (date) and source. “Active/current” means: still mentioned in the most recent reports; what the company no longer mentions moves to the expandable part but is never deleted. Rows in grey are discontinued products.
| Product/Line | Since | Status | Source |
|---|---|---|---|
| debt conversion agreement with Minerva Investment Company Limited for $2 million | 2026-02 | Launched | 9 |
| capital raising of $9,358,250 | 2026-01 | Launched | 9 |
| Pre-Feasibility Study (PFS) completion | 2025-12 | Launched | 9 |
| metallurgical test work program | 2025-12 | Launched | 9 |
| mining activities commencement at Sturec Gold Mine | 2024-12 | Launched | 8 |
| share placement | 2024-06 | Launched | 4 |
| underground mining license extension | 2024 | Launched | 4 |
| Sauvolles Lithium Project field exploration program (2x) | 2023-09 | Launched | 1 |
M&A (11)#
All recorded acquisitions (purchases) and divestitures/exits with date, short description and source; deliberately including smaller transactions that summaries often miss. Purchase prices appear only where the company itself has disclosed them. Rows in grey are cancelled transactions; the cancellation date is shown in the row.
Acquisitions
| Transaction / stake | Date | Type | Source |
|---|---|---|---|
| redeemable notes repayment | 2025-07 | Completed | 5 |
| Mining One appointment as PFS Study Manager | 2024-12 | Completed | 8 |
| redeemable note agreement variation | 2024-09 | Announced | 4 |
| Trans Metal Fund LLP transaction discussion (2x) | 2024-08 | Completed | 4 |
| Sauvolles Lithium Project acquisition (2x) | 2024-08 | Completed | 4 |
| strategic placement - Tranche 2 (2x) | 2024 | Completed | 5 |
| PFS and working capital facility (2x) | 2024 | Completed | 8 |
| Strategic transaction discussions for Sturec Gold Mine | 2023-12 | Completed | 1 |
| Updated Sturec Scoping Study (3x) | 2023-11 | Completed | 5 |
| Slovakian Gold Project acquisition agreement | 2019-11 | Announced | 4 |
Divestitures / exits
| Transaction / stake | Date | Type | Source |
|---|---|---|---|
| Sturec Gold Project Sale Process | 2023-12 | Divested | 7 |
Reported KPIs (as disclosed) (90)#
Figures the company discloses itself in addition to the standard financials; order intake, recurring revenue, user or unit counts, adjusted measures. These “story KPIs” usually slip through standard databases; here they are collected as reported, with no calculation of our own. Important: the definition comes from the company itself and can differ from firm to firm; period and source are stated next to every value.
| Date | Period | KPI | Value / change | Source |
|---|---|---|---|---|
| 2025-09-26 | FY2024 | Weighted average number of ordinary shares (prior year) | 189,055,704 | 5 |
| 2025-09-26 | FY2024 | Weighted average number of ordinary shares | 198,975,664 | 5 |
| 2025-09-26 | FY2024 | Total undiscounted free cash flows | US$910M (A$1,427M) | 5 |
| 2025-09-26 | FY2024 | Total LoM production tonnage | 17.6Mt @ 2.12 g/t AuEq | 5 |
| 2025-09-26 | FY2024 | Total LoM production | 1.139Moz AuEq | 5 |
| 2025-09-26 | FY2024 | Total LoM capital investment | US$95.41M | 5 |
| 2025-09-26 | FY2024 | Silver contained | 22.210 Moz | 5 |
| 2025-09-26 | FY2024 | Pre-tax NPV8% | US$768 million / A$1,205 million | 5 |
| 2025-09-26 | FY2024 | Pre-tax IRR | 162.0% | 5 |
| 2025-09-26 | FY2024 | Pre-production capital | US$75.8M | 5 |
| 2025-09-26 | FY2024 | Plant production capacity | 2.3Mtpa | 5 |
| 2025-09-26 | FY2024 | Mining recovery | 95% | 5 |
| 2025-09-26 | FY2024 | Mining licence area | 9.47 sq km | 5 |
| 2025-09-26 | FY2024 | Mine life | 9 years | 5 |
| 2025-09-26 | FY2024 | Life of Mine operating cost estimate | US$1,107/oz AuEq | 5 |
| 2025-09-26 | FY2024 | JORC Measured, Indicated and Inferred Resource | ~2.7 million ounces of gold | 5 |
| 2025-09-26 | FY2024 | Gold equivalent contained | 2.868 Moz | 5 |
| 2025-09-26 | FY2024 | Gold contained | 2.686 Moz | 5 |
| 2025-09-26 | FY2024 | Exploration target | 37.9Mt to 58.2Mt at average grade of 1.79g/t AuEq to 2.75g/t AuEq for total ounces of between 2.18 Moz AuEq and 5.15 Moz AuEq | 5 |
| 2025-09-26 | FY2024 | Au recovery | 91% | 5 |
| 2025-09-26 | FY2024 | Ag recovery | 88% | 5 |
| 2025-03-14 | 2024-H2 | Net assets | 5,778,597 | 8 |
| 2025-03-14 | 2024-H2 | Capitalised exploration and evaluation | 8,684,428 | 8 |
| 2024-09-30 | FY2023 | Total liabilities | 2,330,835 | 4 |
| 2024-09-30 | FY2023 | Total assets | 8,841,021 (AUD thousands) | 4 |
| 2024-09-30 | FY2023 | Shares issued | 195,920,557 | 4 |
| 2024-09-30 | FY2023 | Net assets | 6,510,186 (AUD thousands) | 4 |
| 2024-03-15 | 2023-H2 | Withholding tax expense | -550,000 | 7 |
| 2024-03-15 | 2023-H2 | Travelling expenses | -6,683 | 7 |
| 2024-03-15 | 2023-H2 | Total non-current assets | 2,324 | 7 |
| 2024-03-15 | 2023-H2 | Total liabilities | 2,883,611 | 7 |
| 2024-03-15 | 2023-H2 | Total equity | 6,215,232 | 7 |
| 2024-03-15 | 2023-H2 | Total current liabilities | 2,883,611 | 7 |
| 2024-03-15 | 2023-H2 | Total current assets | 9,096,519 | 7 |
| 2024-03-15 | 2023-H2 | Total assets | 9,098,843 | 7 |
| 2024-03-15 | 2023-H2 | Sturec total undiscounted cashflows | US$706.21M (A$1,103.45M) | 7 |
| 2024-03-15 | 2023-H2 | Sturec total LoM production | 1.134Moz AuEq | 7 |
| 2024-03-15 | 2023-H2 | Sturec silver contained | 22.210 Moz | 7 |
| 2024-03-15 | 2023-H2 | Sturec pre-production capital | US$75.8M | 7 |
| 2024-03-15 | 2023-H2 | Sturec mine life | 9 years | 7 |
| 2024-03-15 | 2023-H2 | Sturec JORC Mineral Resource Total | 68.347Mt @ 1.22g/t Au and 10.11g/t Ag | 7 |
| 2024-03-15 | 2023-H2 | Sturec Gold Mine Pre-Tax NPV 8% | US$506 million / A$791 million | 7 |
| 2024-03-15 | 2023-H2 | Sturec Gold Mine Pre-Tax IRR | 116.0% | 7 |
| 2024-03-15 | 2023-H2 | Sturec Gold Mine After-Tax NPV 8% Conservative | US$239M (A$376M) | 7 |
| 2024-03-15 | 2023-H2 | Sturec Gold Contained | 2.686 Moz | 7 |
| 2024-03-15 | 2023-H2 | Sturec Capital Investment | US$95.41M | 7 |
| 2024-03-15 | 2023-H2 | Sturec AISC | US$927/oz AuEq | 7 |
| 2024-03-15 | 2023-H2 | Share-Based Payments | -134,850 | 7 |
| 2024-03-15 | 2023-H2 | Share Capital | 21,646,947 | 7 |
| 2024-03-15 | 2023-H2 | Sauvolles Project Area | ~300km2 | 7 |
| 2024-03-15 | 2023-H2 | Sauvolles Mineral Claims | 558 | 7 |
| 2024-03-15 | 2023-H2 | Reserves | 1,851,322 | 7 |
| 2024-03-15 | 2023-H2 | Property, Plant and Equipment | 2,324 | 7 |
| 2024-03-15 | 2023-H2 | Occupancy Costs | -30,587 | 7 |
| 2024-03-15 | 2023-H2 | Net Assets | 6,215,232 | 7 |
| 2024-03-15 | 2023-H2 | Liabilities Classified as Held for Sale | 50,821 | 7 |
| 2024-03-15 | 2023-H2 | Legal Expenses | -13,474 | 7 |
| 2024-03-15 | 2023-H2 | Interest Income | 2,533 | 7 |
| 2024-03-15 | 2023-H2 | Exploration Expenses | -170,000 | 7 |
| 2024-03-15 | 2023-H2 | Exploration Target Ounces Low | 2.18 Moz AuEq | 7 |
| 2024-03-15 | 2023-H2 | Exploration Target Ounces High | 5.15 Moz AuEq | 7 |
| 2024-03-15 | 2023-H2 | Exploration Target Low | 37.9Mt | 7 |
| 2024-03-15 | 2023-H2 | Exploration Target High | 58.2Mt | 7 |
| 2024-03-15 | 2023-H2 | Exploration Target AuEq Low | 1.79g/t AuEq | 7 |
| 2024-03-15 | 2023-H2 | Exploration Target AuEq High | 2.75g/t AuEq | 7 |
| 2024-03-15 | 2023-H2 | Employment costs | -100,335 | 7 |
| 2024-03-15 | 2023-H2 | Directors fees | 412,910 | 7 |
| 2024-03-15 | 2023-H2 | Deferred tax liability | 145,590 | 7 |
| 2024-03-15 | 2023-H2 | Corporate compliance | -76,128 | 7 |
| 2024-03-15 | 2023-H2 | Consulting and advisory fees | -25,000 | 7 |
| 2024-03-15 | 2023-H2 | Capitalised exploration and evaluation | 0 | 7 |
| 2024-03-15 | 2023-H2 | Audit fees | -21,060 | 7 |
| 2024-03-15 | 2023-H2 | Assets classified as held for sale | 8,186,131 | 7 |
| 2024-03-15 | 2023-H2 | Advertising and marketing | -150,295 | 7 |
| 2024-03-15 | 2023-H2 | Administration expenses | -147,406 | 7 |
| 2024-03-15 | 2023-H2 | Adina Lithium Project Intersection | 107.6m @ 1.34% Li2O | 7 |
| 2024-03-15 | 2023-H2 | Accumulated losses | -17,283,037 | 7 |
| 2023-10-30 | 2023-Q3 | Sturec Gold Mineral Resource Estimate | 68.347Mt @ 1.22g/t Au and 10.11g/t Ag (1.31g/t AuEq) | 2 |
| 2023-10-30 | 2023-Q3 | Sturec Gold Contained Silver | 22.210 Moz | 2 |
| 2023-10-30 | 2023-Q3 | Sturec Gold Contained Gold Equivalent | 2.868 Moz | 2 |
| 2023-10-30 | 2023-Q3 | Sturec Gold Contained Gold | 2.686 Moz | 2 |
| 2023-10-30 | 2023-Q3 | Sauvolles Lithium Project Area | 300km2 | 2 |
| 2023-09-21 | FY2022 | total equity | 7,067,337 (AUD $) | 3 |
| 2023-09-21 | FY2022 | Total assets | 8,161,382 (AUD $) | 3 |
| 2023-09-21 | FY2022 | exploration and evaluation expenditure | 7,244,999 | 3 |
| 2023-09-21 | FY2022 | Net assets | 7,067,337 (AUD millions) | 3 |
| 2023-09-21 | FY2022 | cash and cash equivalents | 816,540 (AUD millions) | 3 |
| 2023-03-16 | 2022-H2 | Total assets | 9,135,097 (AUD millions) | 6 |
| 2023-03-16 | 2022-H2 | Net assets | 7,966,410 (AUD millions) | 6 |
| 2023-03-16 | 2022-H2 | capitalised exploration and evaluation | 5,955,184 | 6 |
Development#
A condensed summary per reporting period as running text: what changed operationally, which drivers management names, how earnings and cash flow developed. Most recent period first, grouped by year; each text is written from the original report of that period, superscript numbers lead to the source.
FY2025
Global Gold Mining Limited recorded a net loss of $1.7 million in FY2025 (105), with a cash position of $1.6 million at period end (105). Development activity in FY2025 centred on the Sturec Gold Project in Slovakia, where in-adit channel sampling was completed and a metallurgical test work campaign was initiated during the half year (9). An updated Scoping Study delivered a pre-tax NPV8% of US$768 million and an IRR of 162%, with a projected 9-year mine life producing 1.139 million ounces of gold equivalent (9). Subsequent to period end, the company completed a capital raising of $9,358,250 at $0.205 per share and arranged a $2 million debt conversion to Minerva Investment Company, alongside a comprehensive board restructuring (9).
FY2024
Global Gold Mining Limited recorded a net loss of A$2,512,183 for FY2024, widening from A$2,263,451 in the prior year, with cash of A$0.6 million at 30 June 2024 (5, 105). The company advanced development of the 2.7 Moz Sturec Gold Project in Slovakia, completing a revised underground-only Scoping Study that returned a pre-tax NPV8% of US$768 million and IRR of 162%, reflecting improved gold and silver price assumptions and enhanced mining methods (5). A PFS and Working Capital Facility of up to A$5 million was secured to fund progression to a Pre-Feasibility Study, with Mining One Pty Ltd appointed as Study Manager and PFS completion targeted for Q4 2025 (5). Mining activities commenced on 1 December 2024 from the main Andrej Adit in a small-scale operation designed to de-risk the project and maintain Mining Licence validity (5). Strategic placements aggregating A$3.3 million (A$1.3 million during the year, A$2.0 million in July 2025) were completed to strengthen the balance sheet and fund working capital requirements (5).
FY2023
For FY2023, the company recorded nil revenue (103), consistent with its pre-production, exploration-stage status. The full-year net loss narrowed to AUD 2,263,451 from AUD 6,483,519 in the prior year, while cash and cash equivalents declined from AUD 816,540 to AUD 628,398 (4). Operations were funded through a share placement raising AUD 1,602,172 and redeemable notes totalling AUD 1,300,000 raised during the year (4). A Scoping Study for the Sturec Gold Mine was completed demonstrating a pre-tax NPV8% of US$506 million and IRR of 116% for an underground-only mining operation, and the asset was classified as held for sale with Minmetals Securities Co. subsequently appointed as strategic advisor (7, 1). An agreement to acquire the Sauvolles Lithium Project, a district-scale hard-rock lithium exploration project in Quebec, Canada, was also signed during the period (7, 2).
Sources: official investor relations documents#
All original documents used, with type (e.g. quarterly, half-year, annual report), publication date and a direct link to the filing (EDINET/SEC/IR). Every superscript number in the report points to an entry in this list; so every figure can be traced back to its place in the original.
| # | Document type | Published | Link |
|---|---|---|---|
| #6 / #106 | IR-Half | 2023-03-16 | Open |
| #3 / #103 | IR-Annual | 2023-09-21 | Open |
| #2 | IR-Quarter | 2023-10-30 | Open |
| #1 | IR-Quarter | 2024-01-30 | Open |
| #7 / #107 | IR-Half | 2024-03-15 | Open |
| #4 / #104 | IR-Annual | 2024-09-30 | Open |
| #8 / #108 | IR-Half | 2025-03-14 | Open |
| #5 / #105 | IR-Annual | 2025-09-26 | Open |
| #9 / #109 | IR-Half | 2026-03-12 | Open |
FAQ#
Where can I find the official investor relations documents of Global Gold Mining Limited?
The sources chapter links all 16 original filings used (IR documents) with type, publication date and a direct link; every figure in the report carries a source number.